Issue
When does a Convert experiment status turn into "Complete" and what happens afterwards?
Explanation
An experiment status will turn into "Complete" status when its statistical confidence has reached the configured percentage and has reached the configure minimums or maximums in its settings.
The default behavior after its completion is that the Original version will be served as default. This behavior can be changed in the experiment settings.
Comments